Journal of Navigation and Port Research 2003;27(2):179-184.
Published online June 30, 2003.
컨테이너 터미널 선석길이 산정에 관한 실증 연구
송용석, 남기찬, 연정흠, 김정은
An Empirical Study on Berth-Length Calculation of Container Terminal
Yong-Seok Song, Ki-Chan Nam, Jeong-Hum Yeon, Jeong-Eun Kim
Abstract
In order to mitigate the overcapacity of Busan port, Busan new port has, been developed as transshipment port which is capable of handling 8,000 TEU containership. Generally, design of transshipment port has to reflect the capacity of feeder because both mother vessels and feeders enter the planned port at the same time. However, the existing plan of Busan new port capacity needs to be reexamined since the adopted capacity of each berth at new port, 300,000 TEU, does not seem to be enough to handle both mother vessels and feeders. Therefore, in this study we calculated the required number of berth and berth length by considering cargo handling capacity in terms of the ship size and this study makes some implications in relation with the terminal development plan.
Key Words: Large(Mother) vessel;Feeder vessel;Transshipment port;Berth capacity;Berth occupancy ratio;Berth-length;throughput per ship


ABOUT
BROWSE ARTICLES
FOR CONTRIBUTORS
Editorial Office
C1-327 Korea Maritime and Ocean University
727 Taejong-ro, Youngdo-gu, Busan 49112, Korea
Tel: +82-51-410-4127    Fax: +82-51-404-5993    E-mail: jkinpr@kmou.ac.kr                

Copyright © 2024 by Korean Institute of Navigation and Port Research.

Developed in M2PI

Close layer
prev next