부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안 |
김정훈, 국승기 |
|
Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje |
Jung-Hoon Kim, Seung-Gi Gug |
|
Abstract |
This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access rood construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the trafficvolume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly. |
Key Words:
Safe navigation plan;Dredging operations;Traffic congestion;Temporary waterway |
|