Introduction
Premise and Tools of Research
2.1. Research Premise
Table 1
2.2. Tools Used in the FSA
2.2.1. Brainstorming
2.2.2. Bayesian Network
Implementation of FSA
3.1. Hazard Identification(FSA Step 1)
Table 2
Table 3
3.2. Risk Analysis(FSA Step 2)
Table 5
Table 6
Table 7
Table 8
Table 9
Table 10
Table 11
3.3. Risk Control Options(FSA Step 3)
① Identification of risks which need to be controlled (identified in the frequency analysis and the Bayesian Network)
② Identification of RCOs (brainstorming)
③ Determination of reduced risk level as per the application of RCOs (brainstorming and simulations were applied)
④ Identification and performance of RCOs, the cost-benefit assessment of which is necessary.
Table 12
Table 13
PRS types | High | Medium | Low |
---|---|---|---|
DGPS | A1, A2 | A3, A4 | |
HPR | C1,C2 | C3 | |
Artemis | B1,B2 | B3,B4 | |
DARPS | F1,F2 | ||
Taut-wire | D1,D2 | ||
Laser reference | E1,E2 | E3 |
Table 14
3.4. Cost-benefit Assessment(FSA Step 4)
△Cost: Cost per ship of the risk control option during the lifetime of the vessel.
△EcomomicBenefit: Economic benefit per ship resulting from the implementation of the risk control option during the lifetime of the vessel.
△Risk : Risk reduction per ship, in terms of the number of fatalities averted, implied by the risk control option during the lifetime of the vessel.
① Application of the simulation to confirm the reduced risk level caused by additional installation of PRS and confirm the reduced risk level (△R = T(lifetime) × △PLOP(Potential risk reduction of LOP incidents))
② Confirmation of the reduced risk level of LOP incidents obtained through brainstorming
③ Confirmation of the expenses incurred upon application of the RCOs by listening to opinions of manufacturers and vessel companies in order to confirm the price and maintenance cost of PRS device to be added (△C)
④ △C refers to the sum of expenses incurred from application of RCOs and is calculated by using NPV equation
⑤ Calculation of the GCAF on the RCOs
⑥ Confirmation of the reduced risk level expected upon application of the RCOs, the GCAF and the relevant equation
Table 15
DGPS | Artemis | HPR | Taut -wire | Laser | DARPS | |
---|---|---|---|---|---|---|
Initial installation costs(A) | 65,000 | 135,000 | 300,000 | 250,000 | 50,000 | 95,000 |
Maintenance cost/year(Xt) | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 | 20,000 |
Table 16
Table 17
Table 18
3.5. Recommendations(FSA Step 5)
① RCO A1: Additional installation of HPR or taut-wire on the DP vessels where the DGPS is the only PRS
② RCO B1: Installation of HPR as the third PRS on the DP vessels where DGPS and Artemis are installed as the PRS
③ RCO C1: Installation of taut-wire as the third PRS on the DP vessels where DGPS and HPR are installed as the PRS
④ RCO A2, B2, C2, D2, E2 and F2: Recommendation to provide training for manufacturers of the PRS(PRS type specific) DP system.