CrossRef Text and Data Mining
Result of CrossRef Text and Data Mining Search is the related articles with entitled article. If you click link1 or link2 you will be able to reach the full text site of selected articles; however, some links do not show the full text immediately at now. If you click CrossRef Text and Data Mining Download icon, you will be able to get whole list of articles from literature included in CrossRef Text and Data Mining.
Robust Berth Planning under Uncertain Vessel Arrival
Hyun-Ji Park, Jin-Hyoung Park, Sung-Won Cho
J Navig Port Res. 2021;45(3):102-108.   Published online June 30, 2021
DOI: https://doi.org/10.5394/KINPR.2021.45.3.102

Excel Download

An exact robust approach for the integrated berth allocation and quay crane scheduling problem under uncertain arrival times
European Journal of Operational Research. 2021;   Crossref logo
Link1 Link2

Robust berth scheduling with uncertain vessel delay and handling time
Annals of Operations Research. 2011;192(1):123-140   Crossref logo
Link1 Link2 Link3

A simulation optimization method for deep-sea vessel berth planning and feeder arrival scheduling at a container port
Transportation Research Part B: Methodological. 2020;142:174-196   Crossref logo
Link1 Link2

An expanded robust optimisation approach for the berth allocation problem considering uncertain operation time
Omega. 2021;103:102444   Crossref logo
Link1 Link2

The berth allocation problem: Optimizing vessel arrival time
Maritime Economics & Logistics. 2009;11(4):358-377   Crossref logo
Link1 Link2 Link3 Link4

A robust optimization model under uncertain environment: An application in production planning
Computers & Industrial Engineering. 2021;155:107169   Crossref logo
Link1 Link2

Berth allocation problem with uncertain vessel handling times considering weather conditions
Computers & Industrial Engineering. 2021;158:107417   Crossref logo
Link1 Link2

Robust Transmission Planning Under Uncertain Generation Investment and Retirement
IEEE Transactions on Power Systems. 2016;31(6):5144-5152   Crossref logo
Link1

A novel approach to yard planning under vessel arrival uncertainty
Flexible Services and Manufacturing Journal. 2011;24(3):274-293   Crossref logo
Link1 Link2 Link3

Managing Uncertain Arrival Times through Sociomaterial Associations
Environment and Planning B: Planning and Design. 2008;35(6):997-1011   Crossref logo
Link1 Link2